Client Overview:
Planet Convergence supported a large System Integrator delivering a global infrastructure modernization program for a leading pharmaceutical enterprise. The engagement focused on deploying and integrating a new virtualized data center environment across multiple geographic locations while aligning with strict uptime, compliance, and scalability requirements.
The scope included deploying Cisco UCS infrastructure, integrating with existing networking and storage platforms, and enabling a fully virtualized environment using VMware vSphere 7.0.
The Challenges
- Global Scale & Resource Constraints: Limited availability of skilled on-site engineers across multiple regions to support large-scale deployments.
- Complex Integration: Seamless integration of new Cisco UCS B-Series servers with existing Fabric Interconnects, Nexus 9K switches, and NetApp storage.
- Licensing Roadblocks: Unexpected licensing issues affecting data center devices and VMware hypervisors.
- Service Profile Accuracy: Precise configuration of service profiles and vNIC templates was critical to ensure performance consistency.
- Downtime Sensitivity: Business operations required minimal disruption during deployment and upgrades.
Solution Delivered
Planet Convergence delivered a structured, PMO-led execution model supported by experienced field engineers:
1. Project Planning & Execution
- Deployed a dedicated PMO to manage scope, timelines, and coordination between the System Integrator and the end customer.
- Assigned certified on-site engineers skilled in data center infrastructure, virtualization, and networking.
2. Infrastructure Deployment
- Performed rack and stacking of multiple Cisco UCS chassis and servers across DC and DR sites using best practices for cabling and power.
- Integrated new hardware with existing Fabric Interconnects, enabling unified management.
3. Licensing & Firmware Management
- Collaborated with Cisco and VMware TAC to identify and resolve licensing issues.
- Executed a controlled firmware upgrade to version 4.0(4i) across environments with minimal downtime.
4. Virtualization Enablement
- Designed and configured service profile templates and vNICs tailored to pharmaceutical workloads.
- Deployed VMware ESXi 7.0 on all servers using automated processes.
- Implemented vCenter 7.0 for centralized management.
- Activated vSphere 7.0 licenses across all ESXi hosts and vCenter instances.
Results & Benefits
- On-Budget Delivery: PMO-led execution ensured the project was delivered within estimated budget.
- Increased Capacity: Expanded infrastructure capable of supporting larger and more demanding workloads.
- Operational Efficiency: Centralized management via Fabric Interconnects and vCenter reduced administrative overhead.
- Performance Consistency: Optimized service profiles and networking delivered stable, predictable performance.
- Enhanced Resilience: Improved disaster recovery readiness across DC and DR environments.